FORDSON DEXTA
ENGINE REBUILD

23.06.2000
This is the start of the engine rebuild.
The liners were first rebored to the new over sized pistons.
Then the cylinder block was refaced.

14.07.2000
After the block,we sent the crank to be reground.
We also had new small end bushes fitted.

16.08.2000
We then reassembled the bottom half of
the engine and refitted it.

16.08.2000
We then fitted the front axle.
After fitting the front axle we sent the cylinder head
to have new valve guides fitted also new valves, we
also had the cylinder head refaced.

23.11.2000
This is a picture of the engine with the cylinder head on.

We also had the injection pump calibrated and new nozzles
fitted to the injectors.These are now all fitted.
We also have had the radiator recored.
First run up of the engine was on the 3 July 2001